Skip to content

Demonstration site. Blueprint Mechanical is not a real contractor. Licence number, phone numbers and address are placeholders.

INDEX

The service schedule

Nine service lines with reference designations. Each has a written scope, a typical programme, and a list of what you hold at handover. The codes are the same ones we use on drawings and proposals.

How to read this

Every service carries a reference code, from MECH-01 to MECH-09. It appears on the service page, in the footer schedule, on the proposal form, and on the drawings we issue. If you quote a code back to us, we know exactly what you mean.

Whole-job services

Single-contract mechanical design-build. We run the load calculation, select the equipment against it, design the distribution, fabricate, install, and commission the result.

Typical programme
8 to 22 weeks, design through commissioning

Condensing boiler plant, hydronic distribution and radiant floor. Designed around return water temperature, because a condensing boiler that never condenses is an expensive non-condensing boiler.

Typical programme
6 to 16 weeks depending on plant size

Duct design and fabrication to SMACNA and ACCA Manual D. We design to a stated friction rate, fabricate in our own shop, seal to the leakage class we specified, and test it.

Typical programme
2 to 8 weeks including fabrication

Preventive maintenance on a written schedule with recorded readings, so equipment condition is a trend line rather than an opinion. Priority response and after-hours coverage for agreement holders.

Typical programme
Annual agreement, quarterly or semi-annual visits

Commercial systems

Packaged rooftop unit replacement and new installation, from 3 to 50 tons. Curb adaptation, structural check, economizer setup, IEER-driven selection and gas train commissioning.

Typical programme
3 to 10 weeks from order, 1 to 2 days per unit on site

Variable refrigerant flow design and installation, including heat recovery. Line set sizing, refrigerant concentration limits, branch controller placement and the controls integration that makes VRF worth the money.

Typical programme
10 to 20 weeks, design through startup

BAS and BMS work on BACnet MS/TP and BACnet/IP. Sequences of operation written in plain language first, then programmed, then verified point by point against the written sequence.

Typical programme
4 to 14 weeks

MECH-08

Commercial

Commercial mechanical contracting across offices, light industrial, multifamily and tenant fit-out, from a single rooftop changeout to a full plant replacement.

Typical programme
Varies by project. Emergency response within 4 hours for agreement holders.

Residential

Residential heating, cooling and ventilation. Every system starts with a room-by-room Manual J, because the house you have is not the house the rule of thumb assumes.

Typical programme
1 to 5 days on site for most changeouts

We fabricate what we design.

Our shop on Fox Street runs a coil line and a plasma table. That is not a boast about equipment, it is the reason the transition on the drawing is the transition that arrives on site, rather than a stock fitting plus improvisation at height.

It also means we can build a curb adapter for a specific unit on a specific curb in days, which is what makes single-weekend rooftop changeouts possible.

Ductwork engineering
An HVAC sheet metal fabrication shop with a coil line, plasma cutting table and freshly formed galvanized duct sections stacked in rows

Tell us what the building is doing wrong.

Send us the building, the equipment and the complaint. You get a written response with the load we would run, what we would measure first, and a range before anyone visits.

Or call (303) 555-0148. Mon to Fri 07:00 to 17:00.