REF

Three buildings, with the numbers

Case studies with the measured result rather than an adjective. Where we improved something, the reading before and the reading after are both here, along with the equipment schedule.

A note on the figures

These are demonstration case studies for a demonstration company. The engineering is real and the arithmetic checks out, but the buildings and the clients are illustrative.

Rows of packaged rooftop HVAC units and ductwork on a commercial roof in Denver with the Front Range in the distance
Denver, CO · 2025Office, 96,000 ft2

Nine rooftop units replaced over four weekends

A 1998 campus with nine failing packaged rooftop units, non-functioning economizers and duct static pressure high enough to be eating the fan energy budget. Replaced unit by unit on weekends with shop-built curb adapters.

Measured result

Measured fan energy down 31 percent. No tenant lost a working day.

Equipment installed

Packaged rooftop units
9 units
Nominal capacity range
7.5 to 20 tons
Total installed capacity
118 tons
IEER, weighted average
16.4
Refrigerant
R-454B
Economizer
Differential enthalpy
A row of white modular VRF outdoor condensing units with racked refrigerant line sets on a flat commercial roof
Boulder, CO · 2025Laboratory and office, 41,000 ft2

Heat recovery VRF for a laboratory with 19 zones and one budget

Nineteen zones with genuinely opposed loads: instrument rooms rejecting heat year round, perimeter offices calling for heat on the same January morning. Heat recovery VRF plus a dedicated outdoor air unit doing the ventilation properly.

Measured result

Simultaneous heating and cooling handled without a second plant.

System

Configuration
Heat recovery VRF, 3-pipe
Outdoor modules
4 systems, 122 tons total
Indoor units
34
Branch controllers
7
Dedicated outdoor air
6,400 cfm, ERV
Refrigerant
R-454B
Red PEX radiant heating tubing clipped in parallel loops over insulation board on a concrete slab before pour
Aurora, CO · 2024Industrial, 62,000 ft2

A warehouse that finally holds 65 F at the floor

Twelve gas unit heaters that heated the roof structure beautifully and the working floor barely at all. Replaced with a condensing boiler plant and in-slab radiant across the assembly bays.

Measured result

Floor level temperature swing cut from 14 F to under 3 F.

Plant

Condensing boilers
2 at 1,000 MBH
Turndown
10 to 1
Design supply, radiant
105 F
Design return
85 F
Slab loops
96 loops, 6 zones
Tube spacing
12 in. on centre

Your building probably has a version of one of these problems.

Send us the equipment list and the complaint. You get a written response with the load we would run, what we would measure first, and a range before anyone visits.

Or call (303) 555-0148. Mon to Fri 07:00 to 17:00.