Buildings that hold their setpoint.

Commercial and residential HVAC engineering in Denver. Manual J load calculations, documented installs, and systems that actually get commissioned.

Axonometric diagram of a packaged rooftop heating and cooling system A rooftop unit on a curb above a roof deck, with the deck cut away to show the supply trunk, two branch runs, two VAV terminal boxes, three ceiling diffusers and a zone sensor. Each component is labelled with its designation and key specification.EconomizerDifferential enthalpyRTU-120 ton, IEER 16.4, R-454BSupply trunk24 x 12, 0.08 in./100 ftVAV-2850 cfm, 4 kW reheatT-2Zone sensor, BACnet
A packaged rooftop unit, its supply trunk, two branch runs, two VAV terminals, three diffusers and a zone sensor, drawn in axonometric projection and labelled with their designations.
Rows of packaged rooftop HVAC units and insulated ductwork on a commercial roof in Denver, with the snow covered Front Range in the distance
Central Park campus9 units, 118 tons

We design for the air we actually have.

Every catalogue in this industry is written at sea level. Denver is not at sea level, and the gap between those two facts is where most undersized systems in this city come from.

Check any proposal you have been given. If it does not mention altitude, it was priced at sea level, and the equipment on it is probably the wrong size.

5,280ft

Site elevation we design for. Air here is about 17 percent thinner, so the sensible heat constant falls from 1.08 to roughly 0.90.

1°F

Denver heating design condition at 99.6 percent. Heat pumps get selected on capacity here, not at the 47 °F rating point.

48

Engineers, fabricators and service technicians. NATE certified, EPA 608 Universal.

2009

Designing, building and commissioning mechanical systems on the Front Range.

Service schedule

What we engineer.

Nine service lines. Each one has a written scope, a typical programme, and a list of the documents you hold at handover. Open a folder to read the specification.

MECH-018 to 22 weeks

Design-build

One contract from load calculation to commissioning.

Documented at handover

  • Load calculation with the assumptions listed
  • Equipment schedule with model numbers and selection points
  • As-built drawings
MECH-023 to 10 weeks from order

Rooftop units

Packaged RTU replacement, curb adaptation and controls.

Documented at handover

  • Pre-changeout airflow and static pressure readings
  • Curb adapter shop drawing
  • Startup sheet with superheat, subcooling and gas pressures
MECH-0310 to 20 weeks

VRF systems

Heat recovery VRF where zoning and part load matter.

Documented at handover

  • Piping isometric with lengths and elevation differences
  • Refrigerant charge calculation and RCL check per room
  • Commissioning report from the manufacturer startup tool
MECH-046 to 16 weeks depending on plant size

Boilers and radiant

Condensing plant, hydronic loops and slab radiant.

Documented at handover

  • Hydronic schematic with design flows and temperatures
  • Pump curve with the operating point marked
  • Combustion analysis printout at startup and at handover
MECH-052 to 8 weeks including fabrication

Ductwork engineering

Designed to a friction rate. Fabricated in our own shop.

Documented at handover

  • Duct layout with sizes, total effective length and design friction rate
  • Fabrication shop drawings
  • Leakage test results against the specified class
MECH-064 to 14 weeks

Building automation

BACnet controls, sequences written down before they are programmed.

Documented at handover

  • Written sequence of operation
  • Point-to-point verification checklist, signed
  • Trend export from the first 30 days of operation
Axonometric schematic of a single-zone rooftop system serving three VAV terminals A 20 ton packaged rooftop unit on a curb, a supply trunk running below the roof deck to three branch runs, three VAV terminal boxes with linear slot diffusers, a ducted return path, and a DDC controller on a partition. The specification for each component is listed in the readout below the drawing and can be stepped through with the previous and next controls.RA 26x14 · 2,400 cfmSA 24x120.08 in. w.c./100 ftv 1,180 fpm14x812x812x8VAV-1720 cfmVAV-2850 cfmVAV-3640 cfmSLOT 1 · 240 cfmSLOT 2 · 280 cfmSLOT 3 · 210 cfmRTU-120 ton · IEER 16.4ECON · ENTHALPYDDC-1BACnet MS/TPAIR TERMINAL SCHEDULEVAV-1 720/220 cfm 3 kWVAV-2 850/260 cfm 4 kWVAV-3 640/200 cfm 3 kWTOTAL 2,210 cfm designALT 5,280 FT · SHF 0.90
Hover to inspect
RTU-1, packaged rooftop unit20 tons, 8,000 cfm, IEER 16.4, R-454B, 460V/3ph

MECH-02 · Rooftop systems

Look closer at a rooftop system.

A 20 ton packaged unit serving three VAV zones, drawn the way we would issue it. Move the lens over the drawing to read duct sizes, airflows and terminal schedules, or use the stepper to walk through the seven labelled components one at a time.

This is the level of detail that goes into a proposal before anyone talks about price. Sizes are stated, not implied. Static pressure is calculated, not assumed. The economizer has a changeover strategy rather than a hope.

MECH-01 · Design-build

How a design-build job runs.

One contract, five stages, and a document at the end of each one. Nothing gets ordered before the load is calculated, and nothing gets handed over before it is balanced.

  1. Survey and load calculation

    We walk the building, measure what is there, and run the load. Assumptions listed, so you can argue with them.

    Load calculation report

  2. Equipment selection

    Manual S selection against the calculated load, corrected for 5,280 ft. Two or three options priced honestly.

    Equipment schedule

  3. Distribution design

    Duct and pipe designed to a stated friction rate, with the total effective length recorded rather than assumed.

    Layout and shop drawings

  4. Fabrication and install

    Fittings cut in our own shop to the drawing, then installed to the programme we agreed at award.

    As-built drawings

  5. Commissioning and TAB

    Airflows and water flows measured against design, adjusted until they match, and written down.

    TAB and commissioning report

What clients say when you ask them about the paperwork.

Facility managers do not compliment contractors on charm. They compliment them on being told the truth about what needs replacing and what does not, and on being handed a document at the end.

Reviews are illustrative for this demonstration site. The cube turns on its own, and stops when you hover it or move focus into it.

They measured the static pressure before quoting and told me two of my units did not need replacing. That is the first time a contractor has talked me out of spend.
Marisol Trejo-BehnDirector of Facilities, Central Park flex office campusNine rooftop unit replacement, 2025

Where we work.

Our shop is on Fox Street in Denver. Three cities get a dedicated team and a written response time; the rest of the Front Range is covered from the same building.

Also covering Lakewood, Arvada, Westminster, Thornton, Wheat Ridge, Golden and 6 more.Full list

The Denver skyline with the snow covered Front Range rising behind it under a clear high-altitude sky
Denver sits at 5,280 ft in climate zone 5B: dry air, 30 °F daily swings, and a heating design condition near 1 °F.

Tell us what the building is doing wrong.

Send us the building, the equipment and the complaint. You get a written response with the load we would run, what we would measure first, and a range before anyone visits.

Or call (303) 555-0148. Mon to Fri 07:00 to 17:00.